Currently, we have begun working on the bunkers. We have 65 bunkers on the course and this
project will keep us busy for the next few weeks. First, we are cutting a new edge on all of
the bunkers. As illustrated in the
photos below, the edges become ragged over time. Cutting a new edge provides a much cleaner
appearance and allows us a defined edge to trim and maintain. Next, we will begin checking sand depths and
moving sand around the bunker to provide a consistent depth. New sand will be
added to the bunkers where needed as well.
This will help improve playability and consistency. However, many of the bunkers drain very
poorly, leading to continuous wet sand that is very firm. To alleviate these
conditions the bunkers at some point will need new drainage and sand.
Shadow Hills Greens
Tuesday, February 27, 2018
Audubon Cooperative Sanctuary Program
For those of you who
aren’t aware, Shadow Hills Country Club is a certified Audubon Cooperative
Sanctuary golf course. At the time our facility was awarded this
achievement in May of 2016, there were only 19 golf courses in the state of
Oregon to hold this designation. To
become certified with the Audubon Cooperative Sanctuary Program (ACSP), one
must demonstrate and document efforts in the following categories:
1.) Wildlife and
habitat management.
2.) Chemical use
reduction and safety.
3.) Water
conservation.
4.) Water quality
management.
5.) Environmental
Planning.
6.) Outreach and
education.
Our goal in achieving
certification with the ACSP was to improve our management of the property in an
environmentally friendly manner. This
effort was led by Assistant Superintendent, Jake Witherspoon.
Sunday, October 1, 2017
#2 Tee
The construction of #2 tee has been completed. The seed is starting to germinate and it's looking good. In addition to new irrigation for the tee complex, we installed four sprinklers down the right side of the first half of the fairway. These sprinklers will water the rough in this area that was previously unirrigated.
Monday, September 4, 2017
Cart Paths
Thursday, July 13, 2017
Wildflower update
Friday, June 9, 2017
Bunker Sand
This week we are beginning to check sand depth in the bunkers throughout the course, adding sand where necessary. Our goal is to have 3-4" of sand on the bunker floor and 2" on the bunker faces. We are also sifting rocks out of the existing sand, that have surfaced from the bunker floor. The photos of #3 fairway bunkers below, illustrate the before and after conditions of this process.
Saturday, May 20, 2017
New Cart Paths!
The cart path project will begin on Monday, May 22nd. The project will include one, 8 1/2 foot wide path, all the way around the course. We will begin work on the front 9 holes the first week and then move to the back 9. The entire path will be completed in 2-3 weeks if the weather continues to cooperate. This week we have been prepping areas with rock for paving and have created some new path areas as well. Resurfacing of the cart paths will be a great improvement for the course!